-
1 Earthwork and foundation engineering
-
2 Chapter 2 Construction of piles
-
2.1 Introduction
-
2.2 Construction of precast pile
-
2.3 Construction of cast-in-place pile
-
2.4 Pile head treatment
-
2.5 Construction of pile cap
-
3 Masonry and scaffolding work
-
4 Concrete Structure Engineering
-
5 Prestressed Concrete Engineering
-
5.1 Pre-Tensioned Concrete
-
5.2 Bonded Post-Tensioned Concrete
-
5.3 un-bonded Post-Tensioned Concrete
-
6 Structure Installation Engineering
-
7 Water proof Engineering
-
7.1 Roof waterproof engineering
-
7.2 Underground waterproof engineering
-
7.3 Interior waterproof engineering
-
8 Principle of Flow Construction
-
8.1 introduction of flow construction
-
8.2 Parameters of flow construction
-
8.3 Organization of flow construction
-
9 Network plan techniques
-
9.1 Foundation of network plan
-
9.2 Activity on line network plan
-
9.3 Time parameter calculation of the activity online network
-
9.4 Activity on node network plan
-
9.5 Activity on line network plan with time scaled
-
9.6 Discussions