目录

  • 1 Earthwork and foundation engineering
    • 1.1 Introduction
    • 1.2 Earthwork calculation
    • 1.3 Earth excavation
    • 1.4 Earth filling and compaction
    • 1.5 Ground treatment
  • 2 Chapter 2  Construction of piles
    • 2.1 Introduction
    • 2.2 Construction of precast pile
    • 2.3 Construction of cast-in-place pile
    • 2.4 Pile head treatment
    • 2.5 Construction of pile cap
  • 3 Masonry and scaffolding work
    • 3.1 Masonry materials
    • 3.2 Brick masonry work
    • 3.3 Stone masonry work
    • 3.4 Scaffolding and vertical transport equipment
  • 4 Concrete Structure Engineering
    • 4.1 General
    • 4.2 Formworks
    • 4.3 Reinforcement bar works
    • 4.4 Concrete works
    • 4.5 Concrete construction in cold weather
  • 5 Prestressed  Concrete Engineering
    • 5.1 Pre-Tensioned Concrete
    • 5.2 Bonded Post-Tensioned Concrete
    • 5.3 un-bonded Post-Tensioned Concrete
  • 6 Structure Installation Engineering
    • 6.1 Lifting machinery
    • 6.2 Structure installation of single-story-workshop
  • 7 Water proof Engineering
    • 7.1 Roof waterproof engineering
    • 7.2 Underground waterproof engineering
    • 7.3 Interior waterproof engineering
  • 8 Principle of Flow Construction
    • 8.1 introduction of flow construction
    • 8.2 Parameters of flow construction
    • 8.3 Organization of flow construction
  • 9 Network plan techniques
    • 9.1 Foundation of network plan
    • 9.2 Activity on line network plan
    • 9.3 Time parameter calculation of the activity online network
    • 9.4 Activity on node network plan
    • 9.5 Activity on line network plan with time scaled
    • 9.6 Discussions
Activity on line network plan with time scaled