Construction Site Layout

1.4 Construction Site Layout

1.4.1 Contents

Location and dimensions of the proposed buildings;

Location of vertical transportation machines;

Stirring shed, processing shed, various materials and semi-finished products, machinery and equipment yard or warehouse;

Temporary water and power supply lines, drainage lines; Safety and fireproofing facility.

1.4.2 Design principle of construction site layout

1.4.3 Design introduction of construction site layout

Description of the area and related area calculation for various sheds, storage yards, and warehouses (cement, sands, and stones);

The area, quantity, and materials of the temporary houses used for production and living.